CONSTRUCTION ESTIMATING
Guessing the price and losing bids? Get it measured and priced.
Too high loses the job, too low loses money. We measure your job off the drawings to NRM2 and price it on real UK rates, so you bid from a number you can stand behind. Send your drawings today, get a fixed fee quote back, full estimate delivered to your deadline.
What Is Construction Estimating?
What you get when you send us the drawings
A construction estimate is a full measure and price of your job, taken off the drawings. Every element counted and costed to NRM2, materials, labour, plant and preliminaries, so you know the number before you bid.
We work from your drawings, specifications and project details, and price the job on real UK rates. You get an estimate you can put straight into your tender or hand to your client, not a rough guess made at night.
A construction estimate helps you:
Win the tender, without underpricing and losing money on site.
Protect your margin, with every element measured so nothing slips through.
Bid with confidence, on real quantities and proper rates, not gut feel.
Send us your drawings and get a priced estimate you can stand behind, delivered to your deadline.
What’s Included in Our Construction Estimating Service
A clear, itemised estimate you can bid from
When you send us your drawings, we measure the whole job and price it on real UK rates. You get a complete, itemised estimate to NRM2, laid out so you can see exactly what’s in the number before it goes in your bid.
You’ll receive:
Itemised cost breakdown, each trade and building element measured and priced.
Labour, materials and plant summaries, costed on real current UK rates.
Markup and profit shown clear, with preliminaries, overheads and contingencies.
Elemental summary to NRM2, grouped by building element for easy checking.
Every estimate lays the whole job out clear, so you bid from a number you can stand behind and hand straight to the client.
Send your drawings
Send your drawings and get a fixed fee quote back, agreed before we start. Full estimate to NRM2, delivered to your deadline.
Need more help?
Our team of UK estimators is here to help. Send your drawings for a fixed fee quote, agreed before we start, with no obligation.
info@myprojectestimating.co.uk
0203 576 2913
ESTIMATING
Single Storey Rear Extension
| Prepared for | Mr & Mrs Sample |
| Prepared by | My Project Estimating |
| Reference | MPE-2026-014 |
| Date | 4 July 2026 |
| Valid for | 90 days from date of issue |
Contents
- 1. Executive Summary
- 2. Basis of Estimate
- 3. Drawings & Information Relied Upon
- 4. Pricing Summary by Stage
- 5. Preliminaries
- 6. Detailed Stage Breakdown
- 7. PC Sums & Provisional Sums
- 8. Value Engineering Options
- 9. Assumptions
- 10. Exclusions
- 11. Qualifications & Site Verification
- 12. Stage Payment Schedule
- 13. Next Steps
- 14. Standard Terms
1Executive Summary
This report sets out our estimate for the construction of a single storey rear extension at 14 Oakfield Road, London SW00 0AA, providing approximately 42 m² additional floor area. It has been prepared for Mr & Mrs Sample on the basis of the drawings and information listed in Section 2.
The net total of £128,788.03 includes overheads and profit at 8% and a construction contingency at 5%. With VAT at 20%, the total is £154,545.64.
The estimate carries PC and provisional sums totalling £27,414.00 for items not yet finally selected (Section 7). We have also set out value engineering options in Section 8 that could reduce the cost by up to £7,150.00 if adopted.
This is an estimate rather than a fixed-price tender. It should be read together with the assumptions, exclusions and qualifications, which define exactly what is and is not included. All dimensions must be verified on site before ordering or starting work.
2Basis of Estimate
This estimate has been prepared on the following basis. Where information was not available, a reasonable allowance has been made and identified as a PC or provisional sum.
| Project | Single Storey Rear Extension, 42 m² additional floor area |
| Location | 14 Oakfield Road, London SW00 0AA |
| Scope | Construction of the extension including groundworks, structure, roof, external envelope, first and second fix, finishes, kitchen and sanitaryware installation, and associated external works. |
| Measurement | Quantities measured from the listed drawings in accordance with NRM2 principles. |
| Pricing | Current UK market labour and material rates at the date of issue. |
| Programme | Single continuous build assumed. No allowance for phasing or accelerated working. |
| Contract | Assumed a standard domestic building contract. Not yet agreed. |
If any of the above changes, in particular a drawing revision or a change of specification, the estimate should be revisited.
3Drawings & Information Relied Upon
This estimate is based on the following drawings and their revisions. Pricing relates to these revisions only. A later revision may change quantities and cost.
| Drawing | Title | Rev | Originator |
|---|---|---|---|
| A-100 | Existing plans and elevations | Rev C | Sample Architects Ltd |
| A-101 | Proposed ground floor plan | Rev D | Sample Architects Ltd |
| A-102 | Proposed elevations and section | Rev D | Sample Architects Ltd |
| A-200 | Proposed roof plan | Rev B | Sample Architects Ltd |
| S-01 | Structural layout and beam schedule | Rev B | Consulting Structural Engineer |
| S-02 | Foundation details | Rev A | Consulting Structural Engineer |
4Pricing Summary by Stage
The table below summarises the net cost of each stage of the works, excluding VAT. Preliminaries are shown in Section 5 and a full breakdown of every stage follows in Section 6.
| Stage | Net (excl. VAT) |
|---|---|
| Preliminaries | £17,640.00 |
| Groundworks & Foundations | £10,452.40 |
| Superstructure & Walls | £21,350.00 |
| Roofing | £9,976.00 |
| Windows & External Doors | £8,020.00 |
| First Fix M&E | £6,478.00 |
| Internal Finishes | £15,585.30 |
| Kitchen & Sanitaryware | £17,550.00 |
| External Works | £6,920.00 |
| Net works | £113,971.70 |
| Overheads & profit @ 8% | £9,117.74 |
| Construction contingency @ 5% | £5,698.59 |
| Net total (excl. VAT) | £128,788.03 |
| VAT @ 20% | £25,757.61 |
5Preliminaries
Preliminaries cover the cost of running the project that is not tied to a single trade, site set-up, management, access, welfare, temporary works and general attendance. They are listed as items and priced for a build of this size and duration.
| Item | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Site set-up, welfare unit and temporary fencing | 1 | item | £2,850.00 | £2,850.00 |
| Scaffolding to rear elevation, 12 week hire | 1 | item | £3,420.00 | £3,420.00 |
| Skip hire and waste removal, 6 x 8yd | 6 | each | £285.00 | £1,710.00 |
| Site management and supervision | 12 | week | £640.00 | £7,680.00 |
| Temporary services, protection and general attendance | 1 | item | £1,980.00 | £1,980.00 |
| Total preliminaries | £17,640.00 | |||
Preliminaries are time-related. A longer programme, or a stop-start programme, would increase this figure.
6Detailed Stage Breakdown
Each stage is broken down into its works. Under every work, costs are grouped into materials, labour and plant. Rates are net of VAT and reflect current UK market prices.
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| Reduce level dig and cart away spoil | 38 | m3 | £46.50 | £1,767.00 |
| Excavate for trench fill foundations | 22.4 | m3 | £52.00 | £1,164.80 |
| Plant | ||||
| 3 Tonne excavator hire | 3 | day | £195.00 | £585.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Ready-mix C25 concrete | 22.4 | m3 | £142.00 | £3,180.80 |
| Sand blinding and 1200g DPM | 42 | m2 | £9.80 | £411.60 |
| 100mm PIR floor insulation | 42 | m2 | £21.40 | £898.80 |
| Labour | ||||
| Pour foundations, lay and power-float slab | 42 | m2 | £58.20 | £2,444.40 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Facing brick, block and cavity materials | 78 | m2 | £118.00 | £9,204.00 |
| Facing bricks to match existing (PC allowance) | 3.2 | 1000 | £720.00 | £2,304.00 |
| Labour | ||||
| Bricklaying and blockwork to cavity wall | 78 | m2 | £50.00 | £3,900.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Steel beam to rear opening | 1 | item | £1,650.00 | £1,650.00 |
| Labour | ||||
| Install steel, padstones and make good | 1 | item | £2,680.00 | £2,680.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Blockwork and ties | 26 | m2 | £24.00 | £624.00 |
| Labour | ||||
| Build internal partitions | 26 | m2 | £38.00 | £988.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Firrings, joists and 18mm deck | 42 | m2 | £34.00 | £1,428.00 |
| Labour | ||||
| Construct flat roof structure | 42 | m2 | £26.00 | £1,092.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| 150mm PIR warm roof insulation | 42 | m2 | £28.50 | £1,197.00 |
| Labour | ||||
| Lay and fix insulation boards | 42 | m2 | £9.50 | £399.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Single-ply membrane and trims | 42 | m2 | £22.00 | £924.00 |
| Labour | ||||
| Install single-ply covering and detailing | 42 | m2 | £18.00 | £756.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Rooflights, 2 no. (PC allowance) | 2 | each | £1,250.00 | £2,500.00 |
| Fascia, soffit and rainwater goods | 1 | item | £980.00 | £980.00 |
| Labour | ||||
| Install rooflights and rainwater goods | 1 | item | £700.00 | £700.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Aluminium bi-fold doors, 3.6m (PC allowance) | 1 | each | £4,200.00 | £4,200.00 |
| Labour | ||||
| Install bi-fold door set and make good | 1 | each | £480.00 | £480.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Double glazed windows, 4 no. (PC allowance) | 4 | each | £680.00 | £2,720.00 |
| Labour | ||||
| Install windows and make good | 4 | each | £155.00 | £620.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| First fix electrics to extension | 1 | item | £2,450.00 | £2,450.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| First fix plumbing and heating, 3 radiators | 1 | item | £2,180.00 | £2,180.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Underfloor heating kit | 42 | m2 | £18.00 | £756.00 |
| Labour | ||||
| Install underfloor heating | 42 | m2 | £26.00 | £1,092.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Plasterboard, skim and screed materials | 1 | item | £2,400.00 | £2,400.00 |
| Labour | ||||
| Plaster, skim and screed | 210 | m2 | £21.53 | £4,521.30 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Floor finish supply (PC allowance) | 42 | m2 | £45.00 | £1,890.00 |
| Labour | ||||
| Prepare and lay floor finish | 42 | m2 | £22.00 | £924.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| Painting and decorating throughout | 1 | item | £3,200.00 | £3,200.00 |
| Second fix joinery, skirting and architrave | 1 | item | £2,650.00 | £2,650.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Kitchen units and worktops (PC sum) | 1 | sum | £12,000.00 | £12,000.00 |
| Labour | ||||
| Install kitchen and connect appliances | 1 | item | £2,400.00 | £2,400.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Sanitaryware to WC (PC sum) | 1 | sum | £1,800.00 | £1,800.00 |
| Labour | ||||
| Second fix plumbing and sanitaryware | 1 | item | £1,350.00 | £1,350.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| Rebuild patio and level rear garden | 1 | item | £3,850.00 | £3,850.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| Drainage connections and gullies | 1 | item | £1,420.00 | £1,420.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| Make good at junction with existing house | 1 | item | £1,650.00 | £1,650.00 |
7PC Sums & Provisional Sums
The items below are allowances, not fixed prices. A Prime Cost (PC) sum is money set aside for materials or fittings not yet finally selected. A provisional sum is money set aside for work that cannot yet be precisely measured. Each is reconciled against the actual cost once selections and details are confirmed.
| Item | Type | Allowance (excl. VAT) |
|---|---|---|
| Facing bricks to match existing | PC Sum | £2,304.00 |
| Rooflights (2 no.) | PC Sum | £2,500.00 |
| Aluminium bi-fold doors, 3.6m | PC Sum | £4,200.00 |
| Windows to extension (4 no.) | PC Sum | £2,720.00 |
| Floor finish supply | PC Sum | £1,890.00 |
| Kitchen units and worktops | PC Sum | £12,000.00 |
| Sanitaryware to WC | PC Sum | £1,800.00 |
| Total allowances | £27,414.00 | |
8Value Engineering Options
The following options could reduce the cost without changing the size or layout of the extension. They are optional. Each shows the saving against the net total and a short note on the trade-off. We are happy to talk any of them through.
| Option | Area | Saving |
|---|---|---|
| Single-ply membrane roof to a high-performance felt system Reduces roof cost with a proven felt build-up. Slightly shorter guarantee period. | Roofing | −£1,260.00 |
| Aluminium bi-fold to uPVC French doors with side lights Lower-cost door set. Reduces the opening's slimline appearance. | Windows | −£2,350.00 |
| Porcelain floor tiles to engineered timber / LVT Alternative floor finish at a lower supply rate. Subject to selection. | Finishes | −£840.00 |
| Standard rooflights to fixed frameless units Fixed instead of opening rooflights. Loses ventilation via the roof. | Roofing | −£700.00 |
| Client-supplied kitchen (trade discount retained by client) Client procures kitchen directly. MPE installs only. Removes our PC margin. | Kitchen | −£2,000.00 |
| Maximum saving if all options adopted | −£7,150.00 | |
9Assumptions
This estimate is prepared on the following assumptions. If any prove incorrect, the price may change.
- Pricing is based on the drawings and revisions listed in the Basis of Estimate. Any subsequent revision may change the price.
- Works are assumed to proceed continuously, with clear and uninterrupted access to the rear of the property throughout.
- Existing foundations, drains and services are assumed sound and in the positions indicated. Any diversions are excluded.
- Ground is assumed to be firm and free from rock, running water, contamination or made ground. Standard trench-fill depths assumed.
- Existing walls where the extension connects are assumed sound and suitable to be built off and made good.
- Mains water, drainage and electricity are available at the property and of adequate capacity.
- All PC and provisional sums are allowances only and will be reconciled against actual selections and costs.
- Working hours are standard weekday hours. No allowance is made for weekend, night or accelerated working.
10Exclusions
The following are not included in this estimate. If any are required, they can be priced separately on request.
- VAT reliefs or zero-rating (priced at standard rate unless confirmed otherwise)
- Party wall awards, surveyor fees and any associated works
- Planning fees, building control fees and statutory charges
- Architect, structural engineer and other consultant fees
- Asbestos survey, removal or licensed disposal
- Removal of unforeseen obstructions, rock, contaminated or made ground
- Diversion or upgrade of existing incoming services and meters
- Tree removal, root protection measures and arboricultural works
- Landscaping and planting beyond the patio and levelling stated
- Loose furniture, white goods and appliances (unless within a stated PC sum)
- Works to the existing house beyond making good at the junction with the extension
- Temporary alternative accommodation for the client during the works
11Qualifications & Site Verification
This estimate is issued subject to the following qualifications.
- All dimensions and quantities are taken from the drawings listed and MUST be verified on site before any materials are ordered or works commence.
- This is an estimate, not a fixed-price tender. Final cost is subject to confirmed selections, site conditions and any design development.
- Where a specification is not yet fixed, a reasonable allowance has been made and flagged as a PC or provisional sum.
- Structural elements are priced to the engineer's current design. Any change following building control review may affect the price.
- The estimate assumes a single continuous build programme. A phased or stop-start programme would be repriced.
- Prices are held for the validity period stated on the cover. Beyond that, material prices in particular are subject to review.
12Stage Payment Schedule
On acceptance we would propose the following stage payments, each due on completion of the stage and against a valuation. Percentages are of the net total (excl. VAT). VAT is added to each payment.
| Stage | % | Net amount |
|---|---|---|
| Mobilisation / deposit on acceptance | 10% | £12,878.80 |
| Groundworks and foundations complete | 20% | £25,757.61 |
| Superstructure and roof watertight | 25% | £32,197.01 |
| First fix M&E and plastering complete | 20% | £25,757.61 |
| Second fix, kitchen and finishes complete | 20% | £25,757.61 |
| Practical completion and snagging signed off | 5% | £6,439.40 |
| Net total | 100% | £128,788.03 |
This is an indicative schedule for discussion. Final stage payments are agreed and set out in the building contract.
13Next Steps
To move this forward:
- Review this estimate and the assumptions, exclusions and qualifications in full.
- Confirm any PC and provisional sum selections so those allowances can be firmed up.
- Let us know which, if any, value engineering options you would like us to apply.
- On acceptance, we issue a contract sum, programme and a stage payment schedule.
- Contact us with any queries and we will be happy to talk them through.
We look forward to hearing from you.
My Project Estimating
info@myprojectestimating.co.uk • 020 3576 2913
myprojectestimating.co.uk
14Standard Terms
This estimate is issued on the following terms. It is an estimate of likely cost based on the information available at the date of issue and is not a fixed-price tender or an offer to contract. Prices are held for 90 days from the date of issue, after which they are subject to review, in particular material prices. Quantities are measured from the drawings listed and must be verified on site before ordering or commencing works. PC and provisional sums are allowances only and are reconciled against actual cost. The assumptions, exclusions and qualifications in this report form part of the estimate and define its scope. No liability is accepted for matters outside the stated scope or for changes arising from revised information, site conditions or design development. Any contract arising will be documented separately and will take precedence over this estimate.
Company No. 11255002
info@myprojectestimating.co.uk • myprojectestimating.co.uk
What You Receive
Every estimate comes as a complete, editable document in PDF, Word and Excel. Everything laid out clear, so you can bid from it, hand it to the client, and keep your costs straight.
Cover Page
Your project title, address, and company details presented in a clean, professional layout.
Cover Letter
A personalised introduction with project summary, estimated value, and validity period.
Quote & Summary
A full cost breakdown with subtotals, VAT, and total project value for quick reference.
Resources Breakdown
Detailed costs for every component:
• Materials – each item with unit rate and quantity
• Labour – clear pricing by trade and activity
• Plant & Tools – hire and equipment allowances
• Other Costs – additional or specialist work
Bill of Quantities
Fully measured sections structured by trade, following UK cost rules (SMM7/NRM).
Labour Hours
Clear workforce allocation and time estimate per stage.
Profit & Payment Schedule
Transparent profit margins and staged valuation plan to support project control.
Orders List
Procurement-ready data for materials and subcontractors.
WHY CONTRACTORS SEND US THEIR DRAWINGS
Bid from a number you can stand behind
No two jobs price the same, so we don’t guess. We measure the whole job off your drawings and price it to NRM2 on real UK rates, so you bid from a number you can stand behind, not one cobbled together at night.
Every element measured off your drawings to NRM2, so one line left off doesn't eat your margin on site.
Real measured quantities and proper UK rates, so you price the job on facts, not gut feel.
Give us the bid date. Standard turnaround is a few working days, express when it's tight.
Bid keen enough to take the job, high enough to hold your margin, with a number you can stand behind.
You see the fee before you commit, no hourly billing and no nasty surprises later.
Current UK labour and material rates at the date of pricing, not generic averages.
Every rate shown clear so you see what's in the number, no hidden extras and no guesswork.
A clean, itemised estimate you can hand straight over, so you look like the outfit that has it together.
Your job is measured by a team with 25+ years on UK sites who know how a real job gets built.
Who Benefits from Construction Estimating
Built for UK contractors and subcontractors
No two jobs price the same, so we don’t guess. Whatever you’re pricing, we measure the whole job off your drawings to NRM2 and price it on real UK rates, so you bid from a number you can stand behind.
Main Contractors
Pricing a full tender with no time to measure it all? We take off the whole job to NRM2 and give you a number you can bid from, before your deadline.
Subcontractors
Pricing your package for a main contractor? We measure your scope off the drawings and price it on real UK rates, so you bid keen without getting caught short.
Small & Medium Builders
No QS in the office? You don’t need one. Send the drawings, we do the takeoff, and you get a priced estimate you can stand behind and hand to the client.
PRICED ON REAL UK RATES
How Accurate Are Our Construction Estimates?
We don’t price off generic averages. Your job is measured off the drawings and priced on current UK labour and material rates at the date we quote, so the number reflects what the work actually costs today. You get a full breakdown to NRM2, so you can see exactly what sits behind every figure before it goes in your bid.
NEED MORE THAN AN ESTIMATE
Related Estimating & Cost Planning Services
Got the estimate and need the next piece? We can turn it into a full cost plan, a measured takeoff, or a bill of quantities for tender.
Full breakdowns to keep the budget straight.
Our cost planning breaks the job down by element, structure, finishes, services and external works, priced to NRM2 on UK rates, so you keep the budget straight from the start.
Measured quantities for accurate pricing.
Our quantity takeoff gives you precise measured quantities for every trade off your drawings, so you and your suppliers price from the same numbers, with nothing missed.
Itemised BoQ ready for tender.
Our bill of quantities turns your drawings into a clean, itemised schedule to NRM2, so every trade prices the same scope and your tender goes out clear and consistent.
Get Your Construction Estimate Today
Tender due and no time to measure it all? Send us your drawings and we do the takeoff. You get a fixed fee quote back, agreed before we start, and a full estimate to NRM2 delivered to your deadline.
Send your drawings
Common Questions
Key questions about our estimating services
Not sure how it works or what you get? Here are the questions contractors ask us most, answered straight, so you know exactly what to expect before you send your drawings.
We measure your job off the drawings and price it to NRM2 on real UK rates. You get an itemised estimate covering materials, labour, plant and preliminaries, with markup and overheads shown clear, delivered in PDF and Excel.
Standard turnaround is a few working days. Give us your bid date and we deliver to it. If your deadline is tight, express is available for an extra fee.
We work with UK contractors and subcontractors, from main contractors pricing a full tender to trades pricing a single package. Whatever you're bidding, we price it so you can stand behind the number.
You get your estimate in both PDF and Excel, clearly laid out and easy to read, with a full breakdown you can hand straight to the client.
Your job is measured off the drawings and priced on current UK labour and material rates at the date we quote, not generic averages. You see the full breakdown, so you know exactly what sits behind the number.
Yes. Send the revised drawings and we reprice the affected items, so your number stays right as the job develops.
Yes. If you need anything explained, adjusted or added after we deliver, the team is here to sort it.