The MPE blog

Estimating, cost planning, takeoff and BoQ, for UK contractors

Written contractor-side, for the people who bid and build the work, not the ones who commission it.

Explore by topic

All blog posts

Construction Estimating

Construction estimating companies UK: how to choose the right one

Most estimating firms promise the same things. Here's a practical checklist for choosing one: NRM2, visible quantities, UK rates, fixed fees and who measures.

Read post →
Construction Estimating

Estimating services for subcontractors: pricing your package properly

Pricing a subcontract package from a main contractor's tender pack? How to read the scope, close the gaps between trades and measure your own work properly.

Read post →
Cost Planning

Construction cost estimator UK: when a calculator stops helping

Online build cost calculators give you a number in seconds. Here's where a £/m2 figure is genuinely useful, where it fails, and what a measured cost plan adds.

Read post →
Construction Estimating

Tender pricing services when the deadline won't move

Short on time before a tender return? What tender pricing services cover, from measured quantities to prelims, and what the contractor still decides.

Read post →
Bill of Quantities

What bill of quantities services deliver, and why tenders need them

What a proper bill of quantities service hands back, why NRM2 structure matters, and why every trade pricing the same measured scope protects your tender.

Read post →
Construction Estimating

Quantity surveyor for small builders: when you actually need one

A QS or an estimating service per job? What a quantity surveyor does that an estimator doesn't, what each costs you, and how small builders decide.

Read post →
Construction Estimating

How much does a construction estimating service cost?

No honest provider can quote before seeing your drawings. Here's what actually drives an estimating fee, and why agreeing a fixed fee up front protects you.

Read post →
Construction Estimating

Estimating services for contractors: what comes back and where it fits

What a contractor actually receives from an estimating service, section by section, and how a measured estimate slots into your own tender process without replacing it.

Read post →
Construction Estimating

Outsourced estimating services when the tenders all land at once

Tender peaks stretch an in-house team. How outsourced estimating compares with hiring another estimator, what you get back, and how to keep control of the bid.

Read post →
Quantity Takeoff

Material takeoff services UK: a list you can actually order from

When you need quantities to order from rather than a full price, a material takeoff is the job. What it includes, how it differs from an estimate, and when to use one.

Read post →
Construction Estimating

What a construction estimating service actually does for a UK contractor

What does a construction estimating service do, in plain terms? It measures your drawings, prices every element on current local rates and hands you back a number you can bid from, while you keep the commercial decisions.

Read post →
Construction Estimating

Building estimating service or your own guesswork, what actually changes

Measured estimate vs guesswork isn't about whether you can price a job from memory. You can. It's about what you're really guessing when you do, and what changes once every quantity comes off the drawing.

Read post →
Construction Estimating

An estimating service built around how builders actually work

How a builders estimating service works when you're pricing between jobs, not instead of them: send whatever drawings you've got, name your bid date, agree a fixed fee and get back an estimate you can bid from.

Read post →
Construction Estimating

Construction cost estimating that holds up when a contractor's name is on the tender

A traceable construction cost estimate is one you can walk a client's QS through line by line. When your company's name is on the submission, a number that only sounds right isn't enough.

Read post →
Construction Estimating

Construction estimating for small builders without an estimator on the books

Do small builders need an estimator on the payroll? Usually not full time. But every job you tender still needs measuring and pricing properly, and that work has to land somewhere other than your evenings.

Read post →
Construction Estimating

A builders' estimating service that prices the whole job, not just the headline

What builders miss when pricing a job is rarely the big stuff. It's the preliminaries, the small quantities and the work between trades, the lines that never make the headline figure but always turn up on site.

Read post →
Construction Estimating

Freelance construction estimator or an estimating service, what actually differs

Looking for a freelance construction estimator UK builders can rely on, or an estimating service with a team behind it? Both can price a job well. The differences are in availability, method and your bid date.

Read post →
Quantity Takeoff

A construction takeoff service that measures what's actually on the drawing

What a construction takeoff should include is simple to say and easy to skimp: every element measured off the drawings, laid out to NRM2, with the assumptions written down and nothing left for you to tidy before pricing.

Read post →
Quantity Takeoff

What you get from a quantity takeoff service before you price a job

What you get from a quantity takeoff, done properly, is more than a list of numbers. It's a checked, NRM2-structured measure of the whole job that you can price, send to subcontractors and come back to when things change.

Read post →
Construction Estimating

Tender pricing support for builders who haven't got a QS on the payroll

Pricing a tender without a QS means the reading, measuring, pricing and submission all land on you, usually on top of running live jobs. The part that gets squeezed first is the measuring, and that's where the risk goes in.

Read post →
Construction Estimating

A construction estimating service built for small builders, not big contractors

Pricing small building jobs is a different problem from pricing a big commercial tender. You have one job, one deadline and no estimator on the books, so the service you use has to be built around that.

Read post →
Construction Estimating

An estimating service for residential builders pricing extensions and refurbs

Estimating for residential builders gets treated as an afterthought by services built around commercial work. Extensions and refurbs carry margins just as tight, and a homeowner client who reads every line.

Read post →
Construction Estimating

Construction estimates built from drawings, not from a rough idea

A construction estimate from drawings picks up the level changes, trade junctions and specification notes that a phone call about the job never will. Only one kind of estimate survives contact with the site.

Read post →
Construction Estimating

Pricing an extension, a loft conversion or a house build, the same way every time

Pricing extensions and house builds, and the loft conversions in between, comes down to one method: measure it off the drawings, price the specification on current rates, and bid from a proper estimate.

Read post →
Construction Estimating

Help pricing construction jobs when there isn't time to measure them properly

Help pricing construction jobs matters most exactly when there's no time to measure. The work is on, the tender is due, and the drawings are sitting unopened. Hand over the measuring and keep the decision.

Read post →
Construction Estimating

A tender estimate built for a small building contractor, not a national one

How small contractors compete on tenders against national firms isn't about volume or overhead. It's about putting in a tender estimate that's just as measured and just as defensible, at a price you can build to.

Read post →
Quantity Takeoff

A construction takeoff built straight from your PDF drawings

A takeoff from PDF drawings should start from whatever you've been sent: a clean CAD export, a scanned sketch or a planning set. The format shouldn't hold up the pricing, and it shouldn't lower the standard.

Read post →
Cost Planning

Construction estimating priced to local UK rates, wherever the job is

Regional construction rates UK wide move both labour and material costs, and an estimate built on a national average gets the job wrong in one direction or the other. Here's why local rates matter and how to price with them.

Read post →
Construction Estimating

A domestic building estimating service for the jobs main contractors don't touch

A domestic building estimate for an extension, a loft or a refurb deserves the same care as a commercial tender. Smaller contract, same risk of a missed line, and a homeowner who wants to see where every pound goes.

Read post →
Construction Estimating

An estimating service for builders, wherever in the UK the job is

Remote construction estimating UK wide means your drawings go in from anywhere and a measured, priced estimate comes back to your bid date. What shouldn't change is the standard, or the rates for your region.

Read post →
Construction Estimating

Why a rough estimate costs a small builder more than the fee for a proper one

Rough estimate vs proper estimate looks like a choice between free and paying a fee. On site it rarely works out that way: one missed line or one guessed rate can cost a small builder more than the fee ever would.

Read post →
Bill of Quantities

What a bill of quantities does for a small building contractor that a rough total can't

A bill of quantities for small contractors isn't paperwork for the sake of it. It shows the client why the job costs what it does, gives you a baseline for every variation, and makes a small firm look like a serious one at tender.

Read post →
Cost Planning

Cost planning for a self-build or small development, before the drawings are even final

Cost planning for self build works best before the drawings are locked down, while the design can still move to meet the budget. Leave it until a builder prices the finished set and the only choices left are painful ones.

Read post →
Quantity Takeoff

Quantity takeoff for an extension, measured the same way as a full house build

A quantity takeoff for an extension covers nearly every trade a new house does, squeezed into a smaller footprint and tied into a building nobody drew from scratch. Measure it loosely and the gaps turn up on site.

Read post →
Construction Estimating

What actually slows down pricing a job when you're doing it yourself at night

Pricing a job yourself isn't hard. Doing it after a full day on site, at the kitchen table, with a bid date looming, is what turns a few hours of work into a week of lost evenings. Here's where the time really goes.

Read post →
Bill of Quantities

A bill of quantities every subcontractor prices from the same document

Comparing subcontractor quotes only works when everyone prices the same scope. Send five subbies the drawings and you'll get five readings of the job back, and the cheapest number might just be the one that left the most out.

Read post →
Cost Planning

Cost planning that survives the drawings changing halfway through

Drawings rarely stay as first issued. Cost planning through design changes means setting the plan up by element so each revision is checked against the budget as it lands, instead of discovering the damage when the final estimate comes in.

Read post →
Construction Estimating

Estimating a loft conversion or extension without a rate book from three years ago

A loft conversion estimate priced off a rate you've carried for years only tells you costs have moved once a job comes in over. Measure the drawings, price the actual spec on current rates, and find out before you quote.

Read post →
Quantity Takeoff

What a proper quantity takeoff catches that a quick measure off the plan misses

The commonly missed takeoff items are rarely the big ones. Trims, fixings, sundries, making good and the work between trades slip through a quick measure off the plan, then turn up on site as money you never priced.

Read post →
Cost Planning

Cost planning and a bill of quantities, working from the same set of numbers

Cost plan vs bill of quantities shouldn't be a contest. Built separately by different methods, they tell two stories about one job. Built on the same elemental structure, they reconcile and give the client one story from start to finish.

Read post →
Quantity Takeoff

The Tender's Due and There's No Time to Measure It All. Here's How to Get the Takeoff Done.

The drawings are on the kitchen table and the bid date is Friday. Getting a proper takeoff before the tender deadline, while you're running jobs all day, is a time problem, not a pricing one, and it has a time answer.

Read post →
Construction Estimating

One missed line can eat your margin. Here's what gets left off a tender, and how to stop it.

The items missed on a tender are rarely the big obvious ones. It's the work between trades, the groundworks you couldn't see and the prelims you forgot, and every one of them comes straight out of your margin on site.

Read post →
Construction Estimating

Guessing your tender price is losing you bids. Here's how to price a job you can stand behind.

How to price a construction job without gut feel: measure the quantities off the drawings, price them on current rates, and build up to a number you can defend when the client asks how you got there.

Read post →
Bill of Quantities

The client wants a proper breakdown, not your scribbles. Here's what a good one looks like.

A construction price breakdown for clients is what turns a fair number into a trusted one. Hand over a figure on the back of a job sheet and the client starts wondering what's missing. Hand over a clear breakdown and they start planning the job.

Read post →
Construction Estimating

Before you commit to a bid date, get the scope nailed down

Pre-construction planning UK builders can rely on starts before the price does. If the drawings, revisions and spec aren't settled when the bid date lands, you're pricing a job that will change under you.

Read post →
Construction Estimating

Price a job on last year's rates and you'll lose it, or win it and regret it

The rate in your head for blockwork or concrete came from the last job you priced. If you're not checking current UK construction rates for this job, in this region, you're pricing a job that no longer exists.

Read post →
Bill of Quantities

When your groundworker's rate and your bricklayer's rate don't add up, the tender's already broken

Transparent pricing in construction isn't about showing the client more paperwork. It's about every trade in your tender being measured to the same standard, so the lines agree with each other before anyone starts asking questions.

Read post →
Construction Estimating

Your Estimate Is the Job Before the Job

Every job starts twice: once on paper, once on site. If the paper version is loose, the site version costs you money. An itemised construction estimate is the plan you'll be measured against.

Read post →
Cost Planning

The job's on site. Is it still making the money you priced it to make?

Eight weeks in, someone asks how the job's tracking and nobody really knows. Project cost tracking that works means checking what's spent against what was allowed, package by package, while there's still time to act.

Read post →
Construction Estimating

Pricing a tender this year: what's actually changed and what hasn't

Most of what gets sold as construction estimating trends 2026 is noise. What has shifted is quieter: materials moving at different speeds, lead times back in play, and clients who want to see the working behind a price.

Read post →
Cost Planning

Know the number before you give the client a number

The client asks what the job will cost and you give them a figure from memory. Early stage cost planning is about not doing that: measuring what's drawn first, so the first number you say is one you can keep.

Read post →
Quantity Takeoff

From drawings to measured quantities: how a takeoff actually gets built

A quantity takeoff step by step, from the moment your drawings land to the moment measured quantities come back. What gets checked, what gets measured and what should be flagged before a rate is applied.

Read post →
Construction Estimating

The rushed tender always misses the same things. Here's where they hide

Three days to turn round a tender that deserves two weeks. You price the obvious and move on. A tender estimating checklist won't give you more time, but it will point you at the places the money always goes missing.

Read post →
Construction Estimating

Price it early enough and the number still holds by the time you're on site

The start date slips three months and the rates you priced aren't the rates you're paying. How long a construction quote stays valid depends on the market, not the date on the letter, so price and protect it accordingly.

Read post →
Quantity Takeoff

A guessed takeoff costs you on site. A measured one doesn't

The concrete order comes up short and the price is already fixed. Measured takeoff vs guessed quantities is a difference you never see in the tender, only on site, when the materials either match the job or they don't.

Read post →
Construction Estimating

A tender price you can actually stand behind

You win it on a number you rounded up to be safe, then spend six months hoping it was close. What makes a reliable construction estimate is simple to state: every quantity traced to a drawing, every rate current, nothing hidden.

Read post →
Bill of Quantities

What's actually inside your bill of quantities, and why you should be able to check every line

Hand a subcontractor a lump sum and he can't check it or challenge it. A cost breakdown structure in construction splits the job into elements, each with its own quantity and rate, so every line can be read, questioned and managed.

Read post →
Construction Estimating

Stop Submitting Prices You Priced Six Months Ago

A price built months ago is carrying rates that may already have moved. Knowing when to review a construction estimate, and what to check each time, is what stops a stale number turning into a loss on site.

Read post →
Construction Estimating

The handful of things that actually make a tender price hold up

Most tender prices don't fall apart because the contractor's bad at the job. They fall apart on shortcuts. Cost estimating best practices come down to a few habits: measure it, price it on today's rates, and leave nothing out.

Read post →
Cost Planning

Stop the job running away from you before it's even started

Three weeks in, the numbers stop adding up. Ask why construction budgets overrun and the answer is usually on the tender, not the site: guessed quantities, stale rates and items that never made it into the price.

Read post →
Cost Planning

What We Check Before a Price Goes Out the Door

Most bad prices are not bad arithmetic. They are good arithmetic on bad inputs. These five steps to price a construction job properly cover the information, rates, measurement, checking and layout that a price has to get right.

Read post →
Construction Estimating

Pricing off last year's rates is how you lose money on the next job

Why construction costs fluctuate matters more than most contractors think: the rate you remember from your last tender is already out of date, and pricing off it is one of the quietest ways to lose margin on a job you've won.

Read post →
Cost Planning

Knowing what's coming in against what you're paying out, stage by stage

Cash flow forecasting in construction is what separates a profitable job from a solvent one. You can win at a good margin and still run short mid-contract if nobody has mapped when the money actually moves.

Read post →
Construction Estimating

From drawings to a priced tender, in three steps

How the estimating process works when you hand it over is simpler than most contractors expect: you send the drawings, we measure and price, and you bid on your deadline with a number you can check line by line.

Read post →
Quantity Takeoff

Real measured quantities beat a rough guess, every time

The role of data in cost estimating is simpler than the software sales pitch suggests. The data that matters most is the quantities measured off your drawings, because every rate, total and margin sits on top of them.

Read post →
Cost Planning

Price the job right on day one and the budget holds when you're on site

How to budget a building project so it survives contact with the site: build it element by element from measured quantities, give prelims and provisional sums their own lines, and keep it live once the job starts.

Read post →
Construction Estimating

When the Drawings and the Build Both Sit on Your Desk

Some jobs arrive as a finished set of drawings. Others arrive as a brief and a budget, with the design still to be pinned down. Pricing design and build contracts means pricing the gaps as well as the work.

Read post →
Cost Planning

The Budget Is Your Job to Hold, Not Just Report

Every project has a budget before it has a shovel in the ground, and somebody has to own it all the way through. Cost planning through each project stage is how that number stays honest.

Read post →
Construction Estimating

Stop Treating the First Estimate as the Last Word

An estimate is a snapshot of costs on the day it was written. Materials move, programmes slip and instructions change. Reviewing cost estimates during a project is how you find out before final account does.

Read post →
Construction Estimating

A Tender Price Has to Survive Being Read by Someone Else

A tender estimate gets read by people who weren't on the walk round with you, compared line by line with other contractors and picked apart wherever it looks thin. Here's how to structure a tender estimate so it holds up.

Read post →
Cost Planning

The lines that blow your budget aren't the ones you priced

The hidden costs in a construction budget are rarely the brickwork or the roof. They're the prelims, provisional sums and access costs that never got a line of their own, and they turn a fair price into a loss.

Read post →
Cost Planning

Keeping the budget straight once the job is actually running

Managing a construction budget on site means tracking actual cost against each priced item as you go, so variations and overruns show up the week they happen, not as one unpleasant surprise at final account.

Read post →
Quantity Takeoff

What actually happens after you send us your drawings

Our quantity takeoff workflow, step by step: what happens to your drawings from the moment they arrive, how every element is measured to NRM2, and what comes back to you before your tender deadline.

Read post →
Cost Planning

Building a Budget You Can Actually Stand Behind

A budget pulled together from incomplete drawings and rough rates looks tidy on the page and falls apart once the job starts. Here's how to build an accurate project budget that holds up when it's questioned.

Read post →
Construction Estimating

What Actually Goes Into Pricing a Job Before It Goes Out the Door

A price that goes out missing one item can cost you the margin on the whole job. Here's how to prepare a construction estimate properly: read everything, measure it, visit site, price the unknowns and get it checked.

Read post →
Bill of Quantities

What you actually get back when we price your job

What a construction cost report includes when it comes back from us: a cover page, a summary, a full NRM2 breakdown and, where the job needs one, a bill of quantities. One document, ready to send straight on.

Read post →
Construction Estimating

The Difference Between a Rough Number and a Proper Price

A number given over the phone and a number submitted with your name on it are not the same thing. Here is the real gap between a ballpark figure vs tender price, and why treating one as the other costs builders margin.

Read post →
Construction Estimating

Pricing the job yourself at midnight, or sending us the drawings

Why hire a construction estimator when you can price the job yourself? Because the tender usually gets your worst hours, late at night after a full day on site, and that's exactly when drainage runs and external works get missed.

Read post →
Quantity Takeoff

What a quantity takeoff actually is, and why every number in your bid comes from it

What is a takeoff in construction? It's the measured list of everything on the drawings, item by item, before any price goes against it. Every number in your bid is built on top of it, so if the takeoff's wrong, so is the price.

Read post →
Cost Planning

Where the Money Gets Lost as a Job Moves Through Its Stages

Most jobs do not lose money in one big hit. They leak it across the construction project phases, from a rushed tender to a messy final account. Here is where cost goes wrong at each stage and how to keep the number current.

Read post →
Construction Estimating

Why Your Estimate Needs to Change as the Job Gets Real

An early figure is not a final one. Here are the stages of a construction estimate, from a conceptual number to a definitive price and a control estimate, and the mistakes that make a price fall apart between them.

Read post →
Construction Estimating

What's actually in a tender submission, and where the risk sits for you

What is a construction tender, beyond the headline price? It's the price, the breakdown behind it, the programme and the exclusions you put in writing, and most of the risk for a contractor sits in the parts nobody double-checked.

Read post →
Construction Estimating

Estimate, cost plan, takeoff, BoQ: what each one actually is

The types of construction estimates get muddled all the time, especially when a client uses one word and means another. Here's what a takeoff, an estimate, a bill of quantities and a cost plan each are, and when you need which.

Read post →
Cost Planning

Keeping the budget straight from the tender to the last valuation

You win the job on a number priced weeks earlier, then variations land and the site never quite matches the drawings. Keeping a construction budget on track starts long before valuation four.

Read post →
Cost Planning

Why a price per square metre isn't a price for your job

Cost per square metre estimating gives you a number in five minutes instead of five hours. It feels efficient right up until the job's on site, the ground's open and that number doesn't hold.

Read post →
Cost Planning

Keeping a job's cost under control once you're on site

The tender's won and the job's started. Now the real work begins: holding the number together through variations, weather and a site that never quite matches the drawings. These are the construction cost control strategies that hold.

Read post →
Quantity Takeoff

One set of numbers: how your takeoff, BoQ and estimate should line up

A rough takeoff, a separately built bill and an estimate priced off neither: every gap between them is a place a cost goes missing. Here's why the takeoff to final account chain should be one set of numbers.

Read post →
Cost Planning

Pricing an extension or refurb job without guessing half of it

Thin drawings, a client who wants a number this week and an existing building full of surprises. Pricing extension and refurb jobs by feel works until the ground's opened up and the walls start telling you what they hide.

Read post →
Construction Estimating

What actually makes an estimate accurate

Every contractor wants accurate construction estimates. Few can say what makes one accurate beyond getting it right, which isn't much help at a blank pricing sheet the night before a bid's due.

Read post →
Bill of Quantities

Why Your Price Needs A Proper Breakdown, Not Just A Total

Disputes on site rarely start because the total was wrong. They start because nobody can say what it was made of. A construction cost breakdown UK contractors can defend splits direct costs, indirect costs and risk, and traces each to the drawings.

Read post →
Cost Planning

The Checklist We Run Before Committing To A Price

A price can be right on paper and still lose you money if the scope is vague, a cost category is missing or the payment terms do not match your outgoings. This construction budget checklist covers what to check before you commit.

Read post →
Construction Estimating

The Only Estimating Kit That Actually Matters On Site

Every year brings new software promising to change how you price jobs. Most of it makes no difference if the basics are wrong. These are the estimating tools for builders that actually move the accuracy of a price, starting with the drawings.

Read post →
Construction Estimating

How We Turn An Enquiry Into A Submitted Price

A tender enquiry lands with a deadline and a stack of drawings. What happens next decides whether the price holds up. This construction estimating workflow runs from sorting the enquiry to a checked, traceable submission.

Read post →
Construction Estimating

Pricing A Package When Half The Information's Missing

Subcontract packages rarely arrive complete. Here is how subcontractors price a package properly when the drawings are cut down and the specification points elsewhere: raise queries early, price the programme and state your exclusions.

Read post →
Cost Planning

Sense Checking A Price Against Your Own Job History

A price means little until you check it against something. The most useful construction cost benchmarking is against your own past jobs: what you really spent on a similar scope, recorded the same way each time and used to sense check the next tender.

Read post →
Bill of Quantities

Breaking a Job Down Before You Price It

Most cost breakdowns fall apart before anyone has opened the drawings properly. This construction cost breakdown workflow takes a job from reading the information to splitting it into elements, pricing each one and checking it before submission.

Read post →
Cost Planning

Getting the Cost Plan Right Before You Start Pricing

Most cost plans get written once at tender and never opened again. Here is how to build a construction cost plan in stages, so it follows the job from thin early drawings right through to the final account.

Read post →
Construction Estimating

What Actually Needs Checking Before You Price a Job

Most pricing mistakes aren't bad rates, they're things nobody checked. This construction pricing checklist covers the seven areas that decide whether a price holds up on site or unravels at the first variation.

Read post →
Cost Planning

What Cost Planning Actually Means When You're Pricing the Job

What is cost planning, and why do people keep using it as another word for estimating? The two are different jobs, and mixing them up is how a sound price turns into a loss you only spot at the final account.

Read post →
Construction Estimating

How We Actually Build Up a Price for a Job

Knowing how to estimate construction costs isn't about having a good rate book. It's about reading the drawings properly, measuring every item, pricing it for this job and checking it before anyone else sees it.

Read post →
Cost Planning

Keeping Cost Control Once the Job's Actually Running

Most effort goes into getting the price right before the job starts, then stops at the first fix. Cost control during construction is where margin is actually kept or lost, one valuation and one variation at a time.

Read post →
Quantity Takeoff

Quantity Takeoff, and Why It's Worth Getting Right

What is quantity takeoff, and why does it decide whether your price is any good? It's the measuring that happens before any rate is applied, and every error in it gets carried straight into the number you submit.

Read post →
Cost Planning

What Actually Moves Your Price Between Tender and Final Account

You price a job on a Tuesday and six weeks later half the numbers have moved. These are the construction cost drivers UK contractors deal with between tender and final account, and how to price so they don't take your margin.

Read post →
Construction Estimating

Why Contractors Lose Tenders They Should Have Won

Plenty of contractors lose on price when the number was never the problem. The construction tender process UK clients run scores the whole submission, and a late, vague or incomplete bid gets marked down before anyone compares rates.

Read post →
Construction Estimating

The Job on Every Tender Nobody Has Time to Do Properly

Every contractor ends up estimating, usually late at night between live jobs. The role of a cost estimator is bigger than adding up quantities, and doing it badly costs you far more than doing it slowly.

Read post →
Cost Planning

Cost Plans That Still Hold Up Once the Job Is Running

Too many cost plans are built in a rush before tender and then quietly ignored once work starts. An accurate construction cost plan is one people keep using, because the numbers in it can be trusted three months in.

Read post →
Cost Planning

Keeping Your Job's Numbers Honest From Start to Finish

A price at tender is a snapshot, but the job keeps moving. Construction cost forecasting tells you where each part of the job will finish, while there's still time to act, rather than at the final account.

Read post →
Construction Estimating

What's Actually In A Proper Cost Estimate

If the estimate you get back is just a total, you have been shortchanged. Here is what a professional estimate should include: a proper breakdown, preliminaries and provisional sums split out, and quantities you can trace to the drawings.

Read post →
Construction Estimating

What You're Actually Getting When You Send Drawings Out for Pricing

Send the same drawings to two estimators and you can get back two very different documents. Here is what a building estimate should include before you rely on it, and how to tell a checkable breakdown from a confident guess.

Read post →
Quantity Takeoff

The Real Cost of Doing Your Own Take-offs Between Jobs

The cost of doing your own takeoffs never shows up on an invoice, so it feels free. It isn't. It's in the late nights, the tired mistakes and the tenders you had no room left to price.

Read post →
1 / 1

Send your drawings, get a number you can bid from.

Fixed fee agreed up front, priced to NRM2, delivered to your deadline.