For UK small and medium builders

No QS in the office, but still pricing the next job?

You're on site all day and pricing tenders at night. Send us the drawings and we do the takeoff, measured to NRM2 and priced on real UK rates, so you get a number you can bid from without the late nights. Fixed fee agreed up front, delivered to your deadline.

Priced to NRM2 Fixed fee up front Delivered to your deadline
whole-job · priced
Net total, excl. VAT
£128,788
Priced to NRM2, on real UK rates
Prelims
£17,640
Groundworks
£10,452
Finishes
£15,585
No QS in the office? You don't need one

You're wearing every hat, and the takeoff lands after hours

You run the site, chase the materials, sort the labour, and then price the next job when everyone has gone home. There is no QS in the office to hand it to, so the measure gets rushed, and a rushed measure is where the margin leaks. One line left off is money out of your own pocket once you're on site.

We are your estimating team, without the payroll. Send the drawings, we measure the whole job to NRM2 and price it on real UK rates, and you get a clean estimate you can bid from and hand to the client. You get your evenings back.

Why builders send us their drawings

Price the job right without a QS on the payroll

We are your estimating team

Whole-job takeoffs without carrying a QS, only when you have a job to price.

Nothing slips through

Every element measured to NRM2, so the line you'd have missed doesn't cost you on site.

Get your evenings back

Send the drawings, we do the takeoff, no more pricing jobs at night.

A number you can bid from

Real measured quantities and proper UK rates, not gut feel.

£

Fixed fee, no surprises

You see the fee before you commit, no hourly billing and no surprises later.

25+ years, contractor-side

Measured by a team that has run the work, not a faceless estimating factory.

Sample estimate

See exactly what you'd bid from

The real estimate, open on screen, no email needed. Your job would come back laid out just like this.

Scroll inside to browse the full estimate ↓
CONSTRUCTION ESTIMATE
Single Storey Rear Extension
14 Oakfield Road, London SW00 0AA
Prepared forMr & Mrs Sample
Prepared byMy Project Estimating
ReferenceMPE-2026-014
Date4 July 2026
Valid for90 days from date of issue
£128,788.03 excluding VAT

Contents

  1. 1. Executive Summary
  2. 2. Basis of Estimate
  3. 3. Drawings & Information Relied Upon
  4. 4. Pricing Summary by Stage
  5. 5. Preliminaries
  6. 6. Detailed Stage Breakdown
  7. 7. PC Sums & Provisional Sums
  8. 8. Value Engineering Options
  9. 9. Assumptions
  10. 10. Exclusions
  11. 11. Qualifications & Site Verification
  12. 12. Stage Payment Schedule
  13. 13. Next Steps
  14. 14. Standard Terms

1Executive Summary

This report sets out our estimate for the construction of a single storey rear extension at 14 Oakfield Road, London SW00 0AA, providing approximately 42 m² additional floor area. It has been prepared for Mr & Mrs Sample on the basis of the drawings and information listed in Section 2.

Net works£113,971.70
Net total (incl. OH&P + contingency)£128,788.03
Total incl. VAT£154,545.64

The net total of £128,788.03 includes overheads and profit at 8% and a construction contingency at 5%. With VAT at 20%, the total is £154,545.64.

The estimate carries PC and provisional sums totalling £27,414.00 for items not yet finally selected (Section 7). We have also set out value engineering options in Section 8 that could reduce the cost by up to £7,150.00 if adopted.

This is an estimate rather than a fixed-price tender. It should be read together with the assumptions, exclusions and qualifications, which define exactly what is and is not included. All dimensions must be verified on site before ordering or starting work.

Key figure: £128,788.03 net  /  £154,545.64 including VAT. Valid 90 days.

2Basis of Estimate

This estimate has been prepared on the following basis. Where information was not available, a reasonable allowance has been made and identified as a PC or provisional sum.

ProjectSingle Storey Rear Extension, 42 m² additional floor area
Location14 Oakfield Road, London SW00 0AA
ScopeConstruction of the extension including groundworks, structure, roof, external envelope, first and second fix, finishes, kitchen and sanitaryware installation, and associated external works.
MeasurementQuantities measured from the listed drawings in accordance with NRM2 principles.
PricingCurrent UK market labour and material rates at the date of issue.
ProgrammeSingle continuous build assumed. No allowance for phasing or accelerated working.
ContractAssumed a standard domestic building contract. Not yet agreed.

If any of the above changes, in particular a drawing revision or a change of specification, the estimate should be revisited.

3Drawings & Information Relied Upon

This estimate is based on the following drawings and their revisions. Pricing relates to these revisions only. A later revision may change quantities and cost.

DrawingTitleRevOriginator
A-100Existing plans and elevationsRev CSample Architects Ltd
A-101Proposed ground floor planRev DSample Architects Ltd
A-102Proposed elevations and sectionRev DSample Architects Ltd
A-200Proposed roof planRev BSample Architects Ltd
S-01Structural layout and beam scheduleRev BConsulting Structural Engineer
S-02Foundation detailsRev AConsulting Structural Engineer
Important: all dimensions shown on these drawings must be confirmed on site before any materials are ordered or works commence. Figured dimensions take precedence over scaled dimensions in all cases.

4Pricing Summary by Stage

The table below summarises the net cost of each stage of the works, excluding VAT. Preliminaries are shown in Section 5 and a full breakdown of every stage follows in Section 6.

StageNet (excl. VAT)
Preliminaries£17,640.00
Groundworks & Foundations£10,452.40
Superstructure & Walls£21,350.00
Roofing£9,976.00
Windows & External Doors£8,020.00
First Fix M&E£6,478.00
Internal Finishes£15,585.30
Kitchen & Sanitaryware£17,550.00
External Works£6,920.00
Net works£113,971.70
Overheads & profit @ 8%£9,117.74
Construction contingency @ 5%£5,698.59
Net total (excl. VAT)£128,788.03
VAT @ 20%£25,757.61
Total including VAT£154,545.64

5Preliminaries

Preliminaries cover the cost of running the project that is not tied to a single trade, site set-up, management, access, welfare, temporary works and general attendance. They are listed as items and priced for a build of this size and duration.

ItemQtyUnitRateNet
Site set-up, welfare unit and temporary fencing1item£2,850.00£2,850.00
Scaffolding to rear elevation, 12 week hire1item£3,420.00£3,420.00
Skip hire and waste removal, 6 x 8yd6each£285.00£1,710.00
Site management and supervision12week£640.00£7,680.00
Temporary services, protection and general attendance1item£1,980.00£1,980.00
Total preliminaries£17,640.00

Preliminaries are time-related. A longer programme, or a stop-start programme, would increase this figure.

6Detailed Stage Breakdown

Each stage is broken down into its works. Under every work, costs are grouped into materials, labour and plant. Rates are net of VAT and reflect current UK market prices.

Groundworks & Foundations£10,452.40
Excavation & Disposal£3,516.80
DescriptionQtyUnitRateNet
Labour
Reduce level dig and cart away spoil38m3£46.50£1,767.00
Excavate for trench fill foundations22.4m3£52.00£1,164.80
Plant
3 Tonne excavator hire3day£195.00£585.00
Foundations & Floor Slab£6,935.60
DescriptionQtyUnitRateNet
Material
Ready-mix C25 concrete22.4m3£142.00£3,180.80
Sand blinding and 1200g DPM42m2£9.80£411.60
100mm PIR floor insulation42m2£21.40£898.80
Labour
Pour foundations, lay and power-float slab42m2£58.20£2,444.40

Remaining stages (Superstructure, Roofing, Windows, M&E, Finishes, Kitchen, External Works) follow in the full document, each priced the same way.

7PC Sums & Provisional Sums

The items below are allowances, not fixed prices. A Prime Cost (PC) sum is money set aside for materials or fittings not yet finally selected. A provisional sum is money set aside for work that cannot yet be precisely measured.

ItemTypeAllowance (excl. VAT)
Facing bricks to match existingPC Sum£2,304.00
Rooflights (2 no.)PC Sum£2,500.00
Aluminium bi-fold doors, 3.6mPC Sum£4,200.00
Windows to extension (4 no.)PC Sum£2,720.00
Floor finish supplyPC Sum£1,890.00
Kitchen units and worktopsPC Sum£12,000.00
Sanitaryware to WCPC Sum£1,800.00
Total allowances£27,414.00

8Value Engineering Options

The following options could reduce the cost without changing the size or layout of the extension. They are optional. Each shows the saving against the net total.

OptionAreaSaving
Single-ply membrane roof to a high-performance felt system
Proven felt build-up. Slightly shorter guarantee period.
Roofing−£1,260.00
Aluminium bi-fold to uPVC French doors with side lights
Lower-cost door set. Reduces the slimline appearance.
Windows−£2,350.00
Client-supplied kitchen
Client procures kitchen directly. MPE installs only.
Kitchen−£2,000.00
Maximum saving if all options adopted−£7,150.00
Net total as estimated: £128,788.03, with all options: £121,638.03 (excl. VAT)

Standard Terms

This estimate is issued as an estimate of likely cost based on the information available at the date of issue and is not a fixed-price tender or an offer to contract. Prices are held for 90 days from the date of issue. Quantities are measured from the drawings listed and must be verified on site before ordering or commencing works. PC and provisional sums are allowances only and are reconciled against actual cost.

My Project Estimating  •  60 Tottenham Court Road, Office 676, London W1T 2EW
Company No. 11255002
info@myprojectestimating.co.uk  •  myprojectestimating.co.uk

What you get back

A full estimate you can bid from and hand to the client, everything laid out clear.

A full bill of quantitiesThe whole job, measured to NRM2.
Every item pricedOn real UK rates, so your bid stacks up.
A clear elemental breakdownAcross structure, finishes and services.
Assumptions and exclusions written downSo you know what's in the number.
PDF and ExcelReady to bid from or hand over.
Send your drawings
How we work

Send the drawings, get your evenings back

1

Send your drawings

Your plans, sketches or CAD files, whatever you have.

2

We measure and price it

The whole job measured to NRM2 and priced on real UK rates.

3

You get your estimate

A clean, itemised estimate you can bid from and hand to the client.

Send your drawings
Why builders use us

Whole-job pricing without the overhead

Get your evenings back

We take the takeoff off you so you can run the job.

Nothing missed

Every element to NRM2 so nothing slips through.

£

Protect your margin

Bid a number you can stand behind, not one cobbled together at night.

No QS on the payroll

Whole-job pricing without the overhead.

Need more than the estimate? We also handle full cost planning and a complete bill of quantities, all measured to the same standard.

Common questions

FAQs for small and medium builders

The questions builders ask most before they send us a job, answered plain.

Do I need a QS or full drawings? +
No QS needed, that's what we're for. Send whatever drawings, plans or sketches you have, tell us your deadline, and we take it from there.
How long does it take? +
Standard turnaround is a few working days. If your deadline is tight, express is available for an extra fee. Either way it's tied to your bid date.
What does it cost? +
A fixed fee, agreed up front before you commit. No hourly billing.
Can you price the whole job or just part? +
Both, the whole tender or a single element, we price what you send.
What standard do you measure to? +
NRM2, so every job is measured the same consistent way.

Send the drawings, get your evenings back.

Send us your drawings and get a fixed fee quote back, with the whole job measured to NRM2 and delivered to your deadline.